![]() ![]() Manage RCU both site-supervision and cost control third party Consultants.Manage internal and external stakeholder interfaces & requirements.Review and monitor Contractor’s Contract.Testing Plans against International Common Practices and Standards through management of RCU third party consultant.Review and ensure proper implementation of Contractor Method Statement and Inspection &. ![]() Review and Monitor Contractor Procurement Schedule.Review and Monitor Contractor Schedule Baseline.Review Contractor QA/QC process against RCU’s, and ensure its proper implementation throughout Construction duration.Optional : Project Management / Construction Management (PMCM Services): Manage both Lead Design Infrastructure and Cost Consultants tasks related with above mentioned items, on behalf of RCU D&C.(COP) as part of County Zoning Planning Dept. Schedule, prepare and arrange the Operation and Maintenance procurement and documentation on behalf of RCU County Operation Dpt.Schedule, prepare and review (completeness wise) all the Procurement related documentation on behalf of RCU Procurement Dept.Monitoring the Infrastructure Program CAPEX through Cost Consultant Supervision.Reporting on the Infrastructure Program Schedule Progress against the latest approved baseline.Monitoring, revise and update the Infrastructure Program Schedule Baseline whenever required.Development of the Infrastructure Program Schedule Baseline in coordination with both internal Stakeholders (other RCU Depts, Asset Program Management, Lead Design Infrastructure) and external Stakeholders (National Water Company, Saline Water Conversion Corporation, Saudi Electrical Company, STC, Mobily, etc.), running from planning phase to the end of construction, including procurement for the same.Development and implementation of proper QA/QC documentation.On top of this, SEA is also in charge to deliver special projects such as an experiential Tram line of 20,5km (16 stations) and improve the existing Airport facilities. Here Infrastructure terminology does include Primary and Secondary networks for Road & Mobility, Water & Waste Water, ICT (4G/5G, Fiber Optic, Smart City), Solid Waste as well as Operation and Maintenance Strategy for the overall listed disciplines. Setec-Egis-Assystem Joint Venture (SEA JV) have been hired with the aim to provide a direct support to the RCU in developing, monitoring and administrating the overall Infrastructure Delivery Program, in coordination with the Asset Delivery Program, for the overall AlUla County (22,500 km 2). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |